{"id":30123,"date":"2020-01-01T04:17:08","date_gmt":"2020-01-01T05:17:08","guid":{"rendered":"https:\/\/sabainv.com\/mapna-group-dispatches-first-f-class-turbine-to-andimeshk-power-plant\/"},"modified":"2022-08-28T09:17:58","modified_gmt":"2022-08-28T09:17:58","slug":"second-steam-cycle-of-jahrom-power-plant-synchronized-to-the-grid-2-2-2","status":"publish","type":"post","link":"https:\/\/sabainv.com\/en\/second-steam-cycle-of-jahrom-power-plant-synchronized-to-the-grid-2-2-2\/","title":{"rendered":"MAPNA Group Dispatches First F-class Turbine to Andimeshk Power Plant"},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-medium wp-image-24456\" src=\"https:\/\/sabainv.com\/wp-content\/uploads\/2022\/08\/981004-300x186.png\" alt=\"\" width=\"300\" height=\"186\" \/><\/p>\r\n<p>The new 307-MW turbine increases efficiency to 40 percent in simple cycle thermal plants, and 59 percent in combined cycle plants.<\/p>\r\n<p>Other key features of the F-class turbine include lower fuel consumption and higher compliance to environmental standards.<\/p>\r\n<p>Located near the city of Andimeshk, on the 15th kilometer of Karkheh Dam Road, Khuzestan Province, Dokouheh Combined Cycle Power Plant comprises a single gas turbine with a capacity of 307 MWs, a triple-pressure HRSG (heat recovery system generator), a steam portion with a capacity of 141 MWs, and an air cooling system.<\/p>\r\n<p>Thermal Power Plants Holding Company is the client of the project and Ghods Niroo serves as consultant. MAPNA Special Projects Construction &amp; Development Company (MD-3) represents MAPNA Group as the executor of the project.<\/p>\r\n<p>\u201cMAPNA Group signed a technology transfer agreement for F-class turbines with Siemens following the Ministry of Power\u2019s demand for higher efficiency turbines,\u201d said Majid Bahmani, Managing Director of MAPNA Turbine Engineering and Manufacturing Company (TUGA).<\/p>\r\n<p>\u201cIranian experts will pursue full localization of the turbine,\u201d he added.<\/p>\r\n<p>Pointing to the demand among power plants to install the higher-efficiency F-class turbines, TUGA Managing Director said that 12 sale contracts had been finalized with clients.<\/p>\r\n<p>Bahmani added that full technology transfer of F-class turbines will realize within a time span of three to four years. \u201cOur colleagues in MAPNA Group will design hot components and all main sections of the turbine step by step,\u201d he said.<\/p>\r\n<p>\u201cNo other country has adopted knowhow transfer in this manner and with this level of success,\u201d TUGA Managing Director stressed.<\/p>\r\n<p>Deputy Managing Director of TUGA Mohammad Owliya also commented on MAPNA Group\u2019s latest plans in the manufacturing sector: \u201cbeside F-class turbine technology transfer, MAPNA Group has initiated design and development of a fully local turbine dubbed MGT-75\u201d he said.<\/p>\r\n<p>\u201cProduction of the turbine will kick off in the upcoming months. The final product will be dispatched to power plants by the first half of the next year,\u201d he said.<\/p>\r\n<p>\u201cMGT-75 has a capacity of 220 MWs with an efficiency close to F-class turbines\u201d Owliya added.<\/p>\r\n<p>\u201cMGT-75 is a fully local product and the result of collaboration between MAPNA Group, academia, and research centers,\u201d TUGA Deputy Managing Director reminded.<\/p>\r\n<p>\u201cThe turbine has a lower capacity which needs lower investment but attracts a broader range of clients.\u201d<\/p>\r\n<p><strong>MAPNA Group News<\/strong><\/p>\r\n\r\n<p class=\"wp-block-paragraph\">&nbsp;<\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>The new 307-MW turbine increases efficiency to 40 percent in simple cycle thermal plants, and 59 percent in combined cycle plants.<\/p>\n","protected":false},"author":2,"featured_media":28705,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[22],"tags":[],"class_list":["post-30123","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-of-investee-companies"],"featured_image_src":{"landsacpe":["https:\/\/sabainv.com\/wp-content\/uploads\/2022\/08\/981004-1-763x445.png",763,445,true],"list":["https:\/\/sabainv.com\/wp-content\/uploads\/2022\/08\/981004-1-463x348.png",463,348,true],"medium":["https:\/\/sabainv.com\/wp-content\/uploads\/2022\/08\/981004-1-300x186.png",300,186,true],"full":["https:\/\/sabainv.com\/wp-content\/uploads\/2022\/08\/981004-1.png",763,473,false]},"_links":{"self":[{"href":"https:\/\/sabainv.com\/en\/wp-json\/wp\/v2\/posts\/30123","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sabainv.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sabainv.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sabainv.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/sabainv.com\/en\/wp-json\/wp\/v2\/comments?post=30123"}],"version-history":[{"count":0,"href":"https:\/\/sabainv.com\/en\/wp-json\/wp\/v2\/posts\/30123\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sabainv.com\/en\/wp-json\/wp\/v2\/media\/28705"}],"wp:attachment":[{"href":"https:\/\/sabainv.com\/en\/wp-json\/wp\/v2\/media?parent=30123"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sabainv.com\/en\/wp-json\/wp\/v2\/categories?post=30123"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sabainv.com\/en\/wp-json\/wp\/v2\/tags?post=30123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}